Below are links to the Desalination Conceptual Feasibility Study FINAL DRAFT that was first presented at the October 29 Community meeting.


Chapters

  1. Introduction
  2. Desalination Plant Conceptual Sizing
  3. Feasibility Considerations
  4. Project Implementation
  5. Conclusions and Recommendations

Appendices

  1. Offshore Geologic Study (43.1MB)
  2. Cost Estimate Assumptions

 

Faucetli.gif (445 bytes)

©1998 Montecito Water District
Web design by Infospec.net

blups.GIF (186 bytes)blprevs.GIF (203 bytes)blnexts.GIF (203 bytes)