Schedule of Meter Connection Fees, Tenant Deposits,
Monthly Service Charges and Quantity Rates

Effective March 1, 2007

Meter Size

Connection Fee**

Capital Cost
Recovery Fee

Total

Tenant
Deposit

Monthly Service Charge

5/8" or 3/4"

N/A

N/A

 

*

$ 29.48

3/4"

$    1,817.00

$ 10,566.00

$  12,383.00

*

$ 29.48

1"

$    1,869.00

$ 17,610.00

$ 19.479.00

*

$ 49.13

1-1/2"

$    2,358.00

$ 31,698.00

$ 34,056.00

*

$ 88.41

2"

$    2,810.00

$ 56,352.00

$ 59,162.00

*

$ 157.22

3"

Cost + Overhead

and Equipment

Charges

See

District

Manager

 

*

$ 353.74

4"

 

*

$ 589.57

6"

 

*

$ 982.62

* based on the average of the highest bills within a twelve month period.
** if there is an existing stub, the fee is charged at 2/3 of the full connection fee.

 

 

 

QUANTITY WATER RATES
(in Addition to Monthly Service Charges)
Commercial $ 4.25 per hundred cubic feet
Domestic $ 3.75 per hundred cubic feet
Schools $ 3.49 per hundred cubic feet
Recreational

1st Tier (domestic use)**

$ 3.75 per hundred cubic feet

2nd Tier (recreational use)

$ 2.12 per hundred cubic feet
Agricultural

1st Tier (domestic use)**

$ 3.75 per hundred cubic feet

2nd Tier (agricultural use)

$ 1.68 per hundred cubic feet
East Valley Non-Potable $ 1.51  per hundred cubic feet
**12 hcf per dwelling @1st tier rate; thereafter remaining use x 2nd tier rate.

 

Faucetli.gif (445 bytes)

©1998 Montecito Water District
Web design by Infospec.net

blups.GIF (186 bytes)blprevs.GIF (203 bytes)blnexts.GIF (203 bytes)